Skip to main content

4.1. Inspection Schedule

4.1. Inspection Schedule

 

Inspection is positively necessary to continue and maintain the high performance of robot for long-term operation

There are daily inspection and regular inspection. [Table 4-1] shows basic periods for regular inspections, so inspectors should make an inspection according to the indicated periods

And overhaul every 35,000 operating hours

 

The inspection periods have been reviewed for SPOT Welding. In case of high precision work such as handling, it is recommended to inspect at the half intervals of that period as shown in [Table 4-1]

If you have difficulty in understanding the inspection and adjustment methods, please contact the Hyundai Robotics A/S Center (Customer Support)

 

Table 41 Inspection Schedule

Daily Inspection

Daily

Manipulator, Motor, Reducer

Regular inspection

3months

Wiring, Bolts, Reducer

1 year

Limit switch / Dog, Brake