Skip to main content

6.5. Daily Inspection

6.5. Daily Inspection​

 

Table 6‑3 Daily Inspection

No.

Cycle

(months)

Inspection Part

Inspection Details

Remarks

3

6

12

1

 

◎

◎

Packing of door

‧Transformed & torn part

 

2

◎

◎

◎

Back side

‧Dust and rotation of cooling fan blade

 

‧Damage & dust in regenerative discharge resistance

 

‧Check a heating of Transformer Room by touch, and clean the room.

 

‧Loosening and damage of terminal block of transformer

 

3

◎

◎

◎

Wire harness

‧Loose & damaged connector

 

4

 

◎

◎

Drive Unit

‧Loose & damaged connector

 

5

 

◎

◎

Connectors of each board

‧Check a loose connector by touch

 

6

◎

◎

◎

Operating panel

‧Check Button switch & LED

 

7

 

◎

◎

Overall Controller

‧Dust cleaning

 

8

◎

◎

◎

Nameplate

‧Inspect all kinds of nameplates

 

9

 

◎

◎

Voltage measurement

‧Primary power voltage

Refer to “6.3.1 Adjustment of Power System”

‧CNFN1 B2-C2

‧CN220 B3-C3

‧SR1 P5-M5, P1-M1

10

 

◎

◎

Grounding

‧Check a loose & removed terminal

 

11

 

◎

◎

Battery

‧Voltage inspection & regular replacement

Main board LED

12

◎

◎

◎

Teach Pendant

‧Visual inspection and checking of connections of connectors

 

‧Check LCD Display

 

‧Check LED Display

 

‧Check the status of LED and button switch

 

13

◎

◎

◎

Safety related parts

‧Check emergency stop switching (Controller, teach pendant)

 

◎

◎

◎

‧Check primary power disconnecting switch

  (NFB1)

 

◎

◎

◎

‧Check enabling device of teach pendant

 

◎

◎

◎

‧Check circuit protector (CP1)

 

◎

◎

◎

‧Check magnet connector (MC1, MC2)

 

14

◎

◎

◎

Safety related PCB

‧Check for BD530 board

  (connector, exterior relay)